Home      Products     Sinotruk Engine Parts       Genuine Sinotruk VG1238110076 CFV (Conti...
  • Genuine Sinotruk VG1238110076 CFV (Continuous Flow Valve) Gas Mixer Assembly for MT13/MT07 Natural Gas Engines

Genuine Sinotruk VG1238110076 CFV (Continuous Flow Valve) Gas Mixer Assembly for MT13/MT07 Natural Gas Engines

The VG1238110076 CFV Gas Mixer Assembly is a sophisticated component engineered specifically for Sinotruk’s MT13 and MT07 series natural gas (LNG/CNG) engines. As the core of the fuel induction system, this mixer ensures the perfect stoichiometric ratio of air and gas, which is vital for maximizing engine torque and minimizing harmful emissions.

Designed for heavy-duty performance in SITRAK C7H and HOWO T7H trucks, this CFV (Continuous Flow Valve) assembly responds instantaneously to throttle changes, providing smooth power delivery even under extreme load conditions.

Technical Specifications:
Part Name: CFV Gas Mixer Assembly
Part Number: VG1238110076
System Type: Continuous Flow Fuel Injection System
Engine Compatibility: Sinotruk MT07, MT11, MT13 Euro IV/V/VI Engines
Vehicle Application: SITRAK C7H, HOWO T7H, HOWO T5G (Gas Versions)
Material: Aerospace-grade Aluminum Alloy with corrosion-resistant coating for methane exposure.
Operational Precision: Micro-second response time for air-fuel adjustment.


Installation & Maintenance/Professional Guidelines for VG1238110076 Replacement

Warning: Gas system components must be handled by certified technicians to ensure safety and emission compliance.

  1. System De-pressurization: Before removal, ensure the LNG/CNG fuel system is safely de-pressurized and the master valve is closed.
  2. Cleanliness is Critical: Ensure the intake manifold and air hoses are free from dust or oil residue. Even minor contaminants can affect the CFV valve’s sensitive moving parts.
  3. Seal Integrity: Always replace the O-rings and gaskets (compatible with VG1238110076). Apply a light film of gas-rated lubricant to seals to prevent pinching during installation.
  4. Electrical Connection: Inspect the connector pins for the gas control actuator. Ensure a "click" sound is heard when re-connecting to the ECU harness.
  5. Calibration: After installation, it is highly recommended to perform a "Fuel System Adaptation" using the Sinotruk EOL diagnostic tool to synchronize the new mixer with the engine control unit.
  6. Leak Test: Use a gas leak detector or specialized soap solution to check all joints while the system is under pressure.